Description: G&B were commissioned to remove the small access platform and ladders and design and install a 2000 width cantilevered platform with ladders and safety gate to allow safe access to the emission probes and sensors.
This project was designed, manufactured and fully installed by G&B over a 3 day period which was within the clients scope and avoided any down time.